1. Establish Existing Building Baselines
Before introducing structural modifications or removing load-bearing elements, an accurate measured survey and structural condition audit are vital. Identify existing masonry types, subfloor timber condition, and load pathways.
2. Define Clear Boundary Lines Between Shell & Finishes
Ambiguity between primary structural building works and interior decorative finishes often causes scope creep. Specify structural steel beams, subfloors, and MEP rough-ins as Phase 1 milestones.
3. Verify Planning & Regulatory Sign-offs
Ensure building control notifications, party wall notices, and architectural calculations are in place prior to physical propping or demolition.